what is velocity of approach?

Answer Posted / zia ullah

The average velocity of water in a channel at the point where the depth over a flow measuring weir is recorded.

Is This Answer Correct ?    4 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is geopolymer based concrete?

2158


What is gravity flow?

685


what is the tensile strength of 10swg and 8swg gabion wire?

1564


how can i calculate cement in brickwork

3471


if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel

918






how to conversation of all construction material in to brass

4715


Which is the direction for positive angle?

733


What are the uses of alloys in daily life and how are alloys made?

866


What is diversion tunnel in a dam?

696


Explain major differences between routing maintenance and major maintenance.

660


Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?

5613


Define a polyline?

689


) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.

2260


Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.

2777


How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density

1555