what we do if excavation is more than actual requirement
Answer Posted / lavanya
We can adjust it according to it
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how can we calculate steel value, depending on load
how to calculate rate analysys of 1:6 plastering 10 sq m
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
How will be cutting in timber plate size 600*400 column size
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
List out the potential risk factors for workers on the construction site?
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
What is modular elasticity?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
How and where are aqueducts built?
What are the advantages of cad software’s?