What is the difference between dumpy level and auto level.

Answer Posted / g.a. naidu from guntur

dumpy level is double bubble instrument and levelling is slightly difficult than compare to auto level and the oldest instrument is dumpy level. the clearance of the object is less than compare to auto level
auto level: the instrument is latest and the consisting single bubble. the clearance of the object is high than compare to the dumpy level

Is This Answer Correct ?    8 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

on what basis the partial factor of safety are decided? form the load combinations

1803


1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.

2306


Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance

2150


how water proof chemicals act in concrete to avoid leek?

1764


How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57

1498






Soil bearing capacity formula

1216


Define current ucs?

974


What is the cost difference between site mix and ready mix concrete per cubic meter

1439


please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)

1298


How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?

1435


Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice

2183


Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete

2009


what could be the production cost of 1 cum of concrete by CP30 plant

1271


what are the duties of Site Engineer in work site?

1156


Formula for calculating the volume of bulb in underreamed pile

4392