what is preposition of M-5 grade
Answer Posted / sahilshah.civil@gmail.com
Concrete grade M 5 have mix 1:4:8 (Cement: Sand: Metal)
Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
What is the difference between linear dimension and aligned dimension?
how can calculate cutting length of diamond ring
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
Consumption of Binding wire for fixing of cover block in vertical surface
will fix foundation bolts at site with out template is there any procedure?
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
pls give me some basic informations in construction of a structure?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
How to calculate carrying capacity of the existing water supply trunkmain
How to calculate canal slope curvature qty!
Describe the sections included in a typical bill of quantities
how statics is different from dynamics