Answer Posted / bhola shankar
Least count 5mm
Is This Answer Correct ? | 10 Yes | 3 No |
Post New Answer View All Answers
Cement consumption of one cubic meter of aerocon blocks masonry?
What is alternate bid?
how calculate the bearing from two coordinates?
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
(Project Management Topic) What are the important criteria in the successful realization of the project?
Use of coping on terrace wall and in 4" wall is compulsory or not ?
How to calculate 1 brss for RCC work
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
I need old MMUP exam question and answer for Civil engineering
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
what is w/c ratio in dry lean concrete for m10 mix design