Answer Posted / selvalagan
Below this link you can find the power plant in india..
http://en.wikipedia.org/wiki/List_of_power_stations_in_India
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the meaning of SST300 V56A in SIEMENS turbine
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
Why superheated are started before I'd and rd fan?
operation
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
what is restricted earth fault explain in details
our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
what's the moog valve
LAPT working in alternator / generator
why airtel use + 24 volts and other operators use -48 volt
what is the difference between compensated & normal drum level in boiler drum?
what is the basic use of power plant in equipment
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.