You have casted a column above your footing, and you found out
it is off its location by 5cm. What would you Do?

Answer Posted / suresh baria

Bring it to notice of structural engineer, Let him to give the corrective measure as he is the design auther and he is going to give the stability certificate.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is a tensile strength? What is the tensile strength of wood?

678


Why are separation membranes used between concrete pavement slab and sub-base?

829


What is hybrid foundation?

689


to minimize budget cost of building , what can i do

1672


where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?

768






brickwork labour rate per cum ?

1115


can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com

2061


Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.

1634


why we use aggregate,sand with cement in concrete?

8138


Explain why concrete barriers have curved surface profiles?

827


What is meant by scaffolding coefficient?

2194


What is aggregate?

738


Can we use the flyash bricks in brick bat coba?

1078


Time required for curing of wall tiles before fixing

1778


how to prepare site mix design

1563