what is a pitot tube

Answer Posted / deepak

Velocity head

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/

1815


what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.

2146


what is the weight of 6000 psi concrete in lb/cft?

3102


How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?

4502


How to calculate material and labor required for 100 m2 plaster?

1245






What is binding spacing of the rebars at lapping zones.

615


Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.

2188


how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail

3499


How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?

1443


Explain what is structural frames or systems?

657


How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton

1696


Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.

668


what does the track parameter mean in staad.pro?

5459


How to calculate paint drums per meter square

2016


construction workers how much time take one work or qty

1129