What is the difference between lap splice length and
development length of rebars?
Answer Posted / c.kumar
Splice length is required prior to transfer the load from one bar to another bar and also to minimize the Bending Moment but the develoment length is added to reinforcement in order increase the R.C.C design and bonding strength b/w steel & concrete.
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
cement and sand required for one block of size 0.23*0.15*0.46
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
why do we provide haunches in rcc box or underpasses?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
what is shuttering co efficient?
How to take labor charges for construction of 1cum of concrete?
what is the list of building construction equipment & teir output?
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
What is absolute coordinates?
What is type failure of road surface? how to repair the failure of road surface?
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
what is the type of earthing