Answer Posted / deoghar
Suppose that total length is : 50.00 mtr
Dia of Bar : 32mm ( Lap length is 1600mm )
Then total length is
= 50.00-6.00mtr = 46.00mtr ( 6.00 is 1st Bar)
( 6.00-1.600 = 4.400mtr)
Now 46.00 / 4.4 = 10.450 + 1 =11.45no
You Can say 11 no of lap found
Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
why is the column design?
what is pqc
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
explain fie benefits of using standard terminology in the measurement process
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
what are the Task work of different labour.?
For fine aggregate which is most suitable River sand or crusher sand & why ?
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
Formula of area of crane hook
how to shuttering is used in slab
What is the use of extend command?
what is m30 in concrete tiles
Floor tile measurement? Wall to wall or skirting to skirting