what is the ratio of M10,M20,M30,M40,M50,M60 grade concrete

Answer Posted / siva

M5-1:5:10;
M7.5-1:4:8;
M10-1:3:6;
M15-1:2:4;
M20-1:1.5:3;
M25-1:1:2;
M30-1:1:3; 

Is This Answer Correct ?    2 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to get MEP technical,instaaltion & testing data for interview?

1612


Explain the design for rcc multi-storied building?

700


What is the cost difference between site mix and ready mix concrete per cubic meter

1443


what is the procedure of wet seiving. n percentage of silt in different type of soil?

2178


where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?

766






Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks

1497


Specific gravity of cement?

1210


What are the phases inspections are done by local authority while construction?

721


I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.

5566


how clculate excavated or backfilling quantity by simpson's rule

4736


what is kribs is supporting?

1598


Concrete cover for slab, column, beam and footing?

648


what is the sequence of the activities in the typical under ground water tank including civil & MEP works.

1962


I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.

1675


What is Critical path in Ms-Project ?

701