Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why electrical engineer use Cu Strip for transformer
neutral why not GI Strip? What if we use GI instead of Cu
does it affects the transformer performance.

Answer Posted / bala

If we use GI strip instead of cu. The benefit is cost and also GI resist the fault current than cu, so the level of fault current Is slightly reduced than using cu. ...

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

WHAT IS DIFFERENCE BETWEEN MANUAL CONTROL AND MAGNETIC CONTROL AND STATE ITS ADVANTAGE /DISADVANTAGE

2100


Can we use a absolute encoder to show rpm of a motor ? what about the condition when power is off ? what is difference if a incremental one is used ?abanirout@gmail.com

2042


For a 6.6kV Motor it is recommended to do megger test with 500 V d.c and not more than 5kV d.c but the Hi voltage withstand test should be performed by 12kV AC. Why the dc voltage test should be limited but AC voltage withstand test could be with such a high voltage?

2330


What should be the height of basement according to NBCC code?

2215


Circuit diagram of tube light without starter using electrical choke

4140


What is the most accurate way of testing ELCB?ELCB is better than RCD?

3342


Define load factor?

1134


I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE

1947


HOW TO CALCULATE HV TEST VOLTAGE FOR ELECTRICAL EQPT.

2227


Briefly describe your ideal job?

2977


what is the difference between active power and reactive power and apparant power in practical as well as theoritical

1957


How to calculate fault level of 11 KV system

2093


what is the clear formula to calculate cable size for a load

1972


With a phasor diagram show the effect of increasing the field current of a generator supplying a constant real power and connected to a grid system.

1989


Could the power factor on electrical system can affect the registration of the kwhr meter or the CT/PT? 

1972