explain o2c cycle? what are the table reflected for this
process?

Answer Posted / fayazapps

Oracle Order to Cash tables: O2C tables
Oracle Apps Order to Cash important tables:






Order entry


OE_ORDER_HEADERS_ALL 1 record created in header table

OE_ORDER_LINES_ALL Lines for particular records

OE_PRICE_ADJUSTMENTS When discount gets applied

OE_ORDER_PRICE_ATTRIBS If line has price attributes then populated

OE_ORDER_HOLDS_ALL If any hold applied for order like credit check etc



Order Booked


OE_ORDER_HEADERS_ALL Booked_Flag=Y, Order booked.

WSH_DELIVERY_DETAILS Status Opened

WSH_DELIVERY_ASSIGNMENTS WSH_DELIVERY_ASSIGNMENTS.delivery_id will be NULL as still pick release operation is not performed as final delivery is not yet created.

MTL_DEMAND. ‘Demand interface program’ is triggered in the background and demand of the item with specified quantity is created



Order Scheduled/Reserved This step is required for doing reservations SCHEDULE ORDER PROGRAM runs in the background(if scheduled) and quantities are reserved.

OE_ORDER_LINES_ALL Awaiting Shipping

MTL_RESERVATIONS This is only soft reservations. No physical movement of stock

WSH_DELIVERY_DETAILS R: Ready to Release: Line is ready to be released



Pick Released Pick Release is the process of putting reservation on on-hand quantity available in the inventory and pick them for particular sales order.

OE_ORDER_LINES_ALL

WSH_DELIVERY_DETAILS S: Released to Warehouse

WSH_NEW_DELIVERIES A new record is created in WSH_NEW_DELIVERIES with status_code = ‘OP’ (Open). WSH_NEW_DELIVERIES has the delivery records.

WSH_DELIVERY_ASSIGNMENTS Deliveries get assigned

WSH_PICKING_BATCHES After batch is created for pick release

MTL_TXN_REQUEST_HEADERS A move order is created in Pick Release process which is used to pick and move the goods to staging area (here move order is just created but not transacted). MTL_TXN_REQUEST_HEADERS, MTL_TXN_REQUEST_LINES are move order tables


MTL_TXN_REQUEST_LINES move order line



Pick Confirm Pick Confirm is to transact the move order created in Pick Release process

OE_ORDER_LINES_ALL flow_status_code =’PICKED’

MTL_MATERIAL_TRANSACTIONS_TEMP (Record gets deleted from here and gets posted to MTL_MATERIAL_TRANSACTIONS)

MTL_MATERIAL_TRANSACTIONS MTL_MATERIAL_TRANSACTIONS is updated with Sales Order Pick Transaciton

MTL_TRANSACTION_ACCOUNTS updated with accounting information for mtl_material Transactions

WSH_DELIVERY_DETAILS Y: Staged- Line has been picked and staged by Inventory

MTL_ONHAND_QUANTITIES



Ship Confirmed The goods are picked from staging area and given to shipping. “Interface Trip Stop” program runs in the backend.

OE_ORDER_LINES_ALL .flow_status_code =‘SHIPPED’ Shipped_Quantity get populated

WSH_DELIVERY_DETAILS Released_Status=C ;Shipped ;Delivery Note get printed Delivery assigned to trip stop quantity will be decreased

MTL_TRANSACTIONS_INTERFACE Data from MTL_TRANSACTIONS_INTERFACE is moved to MTL_MATERIAL_TRANACTIONS

MTL_MATERIAL_TRANSACTIONS updated with Sales Order Issue transaction

WSH_NEW_DELIVERIES If Defer Interface is checked then OM & inventory not updated. If Defer Interface is not checked: Shipped

OE_ORDER_LINES_ALL

WSH_DELIVERY_LEGS 1 leg is called as 1 trip.1 Pickup & drop up stop for each trip.

OE_ORDER_HEADERS_ALL If all the lines get shipped then only flag N

WSH_NEW_DELIVERIES Data Deleted

MTL_RESERVATIONS Data Deleted

MTL_DEMAND Data Deleted

MTL_ONHAND_QUANTITIES Item deducted from MTL_ONHAND_QUANTITIES

MTL_TRANSACTION_ACCOUNTS updated with accounting information.

WSH_TRIPS

WSH_TRIP_STOPS



Auto Invoice After shipping the order the order lines gets eligible to get transfered to RA_INTERFACE_LINES_ALL. Workflow background engine picks those records and post it to RA_INTERFACE_LINES_ALL.

OE_ORDER_LINES_ALL invoice_interface_status_code = ‘YES’

WSH_DELIVERY_DETAILS Released_Status=I

RA_INTERFACE_LINES_ALL Data will be populated after work flow process.

RA_CUSTOMER_TRX_ALL After running Auto Invoice Master Program for

RA_CUSTOMER_TRX_LINES_ALL Specific batch transaction tables get populated






Close Order Last step of the process is to close the order which happens automatically once the goods are shipped

OE_ORDER_LINES_ALL flow_status_code =’CLOSED’ and open_flag = ‘N’

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What do you understand by soa?

693


What are do's and dont's of Interface?

1905


pls send me out bound code of supplers,site,bankiformation code pls as soon as

1757


please send me forms, xml pulisher questions,answers

1654


Tell me how to find the custom directory in front end?

662






What is oracle soa suite?

764


Can you explain the difference between architecture followed in 10g & 11g?

657


Is soa a part of oracle fusion middleware?

607


What is the concept of soa governance?

772


List the types of flexfield?

605


How can you achieve loose coupling in soa framework?

722


testing tools?

1752


what is pay run id ?

1708


What is sca and how is it useful?

660


what are the prerequisites for costing transactions?

2635