who much should be the lap length in reinfocement
Answer Posted / rohitash singh
50 D is only for vertical lap
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
what is directivity effect?
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
How can I make justification between using concrete grade c35 compare c37?
Define different types of roof systems?
what is the weight of 10mm,20mm,40mm aggregate
Which is the direction for positive angle?
Are cruise ships built for the transatlantic run?
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
what is the type of earthing
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C