Answer Posted / deshmukhcwm
it is drilling & grouting process for RCC work .
Is This Answer Correct ? | 12 Yes | 3 No |
Post New Answer View All Answers
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
What is the absolute pressure scale?
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
What happens to Load at yielding ?
How is the leaning tower of pisa supported?
what is the hanekom repairing material after concreting work
What is the difference between yeild strength and compressive strength of steel???
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
in plate load test what is the thickness of plate 20mm 5mm 50mm none
What are the disadvantages while using stone dust as filler in pavements?
What is the difference between a wood shake and wood shingles?
significance of specific surface area of particles?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.