How to repair the Pavement quality conc used for toll
plazas if is giving hungry look or honeycombed ?
how much cement need to treat 100sqmtr of Damaged PQC
Answer Posted / h.c.shukla
repair the surface with quartz sand/standard sand with epoxy than fix a pvc nipple & grout with epoxy
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Reinforcement details at hinged joint
how to calibrate the RM 800
what is the difference between np2 and np3 concrete mix
How do you compute the volume of airflow?
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
material used for mendrel use to bend epoxy coated rebar
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
In jack arch floor, the rise is kept?
Prepare a Schedule for a Highrised building from starting stage to Handover?
What is OSHA compliance?
what is the formula to find the diagonal shape stirrups?
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??