why the steam turbine is not operated in home(base) load
more than 1 hour kindly calrify
Answer Posted / yogesh k. patil.
During underload or FSNL operation, Exhaust steam temperature increases as less heat is converted into electrical energy.Underload operation of steam turbine,like 0.9MW for a 20MW turbine is allowed for 1hrs by manufactures like seimens for SST300 turbine.But in case of emergency wher exhaust hood cooling is impelmented, that can be extended.
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
what is restricted earth fault explain in details
what is the meaning of SST300 V56A in SIEMENS turbine
what does mean by kva rating
How do you consider that you can improve and what assistance do you need to achieve this
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?
What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?
what is the trip circuit supervision in an electrical meaning?
what is the difference between compensated & normal drum level in boiler drum?
How to calculate power press toneage
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
Why superheated are started before I'd and rd fan?
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor
what is natural frequency of turbine shaft .
By any way can we increase the B check hours from 300 to 500