Answer Posted / sirohisakshi
If the feed water is too cold then economizer helps in pre heating the water before sending it to feed pump or evaporation zone
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how to calculate stiffners position and size in transformer design
define material grades 15b25,10b21,scm-415,16mncr5 in detailwith their compositions
sir, I am applied RRB chennai,MMV(mechanical),Pls mail 2006,2007 & 2008 years solved question papers.My Mail jrks@rediffmail.com
What is the most important, or helpful,project that you have contributed to?
Instead of having individual transmission what is the benefit of unified transmission?
Name the common carpentry tools?
Between steel, copper and brass, which conduct faster heat.
What do you treat in high alkalinity of boiler water? What is a feed water pump? What is a Booster pump?
What is the importance of thermostat in the cooling system of an engine?
Identify the parts of indicator diagram?
What ill be the shaft diameter with clearance having a bearing bore is 30mm?
how to select speed of the spindle and work head for production jobs ( Internal grinding )
What are the uses of windmill?
What is Lap welding?
why the frequency of natural vibration is always greater than the forcedd vibration.??