At which place Construction joint should provide in slab
and Beam at the time of casting.
Answer Posted / alp
L/4 for Slabs and Beams
L/3 for Columns
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what are the duties of Site Engineer in work site?
What is quantity of cement and sand required for 2000sqft of tiling?
how much to get of BRC lapping in full yield and half yield ?
How do we test on design and style in a software?
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
Which code is used for tor & tmt steel bar?
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
for pretensioning which will yield first and same for post tensioning?
Which type of plywood & sizes using in construction projects ?
what is a well
What was asked in isro civil interview
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
What is .Dwg?
What is fineness modulus ? and its sieve # ?
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.