At which place Construction joint should provide in slab
and Beam at the time of casting.

Answer Posted / alp

L/4 for Slabs and Beams
L/3 for Columns

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what are the duties of Site Engineer in work site?

1162


What is quantity of cement and sand required for 2000sqft of tiling?

2391


how much to get of BRC lapping in full yield and half yield ?

1974


How do we test on design and style in a software?

675


flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force

1498






Which code is used for tor & tmt steel bar?

753


What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?

1334


for pretensioning which will yield first and same for post tensioning?

1713


Which type of plywood & sizes using in construction projects ?

649


what is a well

1506


What was asked in isro civil interview

499


HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?

1749


What is .Dwg?

860


What is fineness modulus ? and its sieve # ?

710


Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.

2386