Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Is there any possibility of changing in dia of bar from
lower to higher (i.e Lower dia bar at bottom and Higher dia
bar at top)

Answer Posted / ghantola

yes in cantilevers and inverted beams

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain what is alternate bid?

1283


what would be the design load of R.C.C Cooling tower per cell.?

2018


Is it possible to make a feature using an overdefined sketch?

1390


how to caluclate sienerge qty in construction in ap

2402


in the earthquqke the profile of water on dam is parabolic or not

1965


What is the Maximum %age of Steel in columns and beams ?

1297


what is civil all interview questions

2802


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2098


What is the use of extruded feature in solidsworks?

1227


How to make tiles floor step by step procedure?

1977


give me the rate analysis for Bituminous Macadam and SDBC

7442


why we are using stub column..? is it possible to construct steel stub column..?

2009


what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?

5109


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

2148


How to calculate construction cost of residential building in mumbai

2050