what is a mix design GSB and WMM

Answer Posted / om prakash

GSB= Granular Sub Base and WMM= Water Mixed Mecadum

Is This Answer Correct ?    13 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is kn measurement?

745


What is the purpose of the gap in the road on this bridge?

703


I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????

1661


How to build the floor to ceiling bookcase?

830


How many days should curing of plastering, brick work and concrete

1213






what is castigliano theaorem

1835


How to marking the building

1500


What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?

1174


can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now

1673


What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?

699


PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg

1886


What are the alternate material for steel, Sand and aggregate

1836


How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)

1518


How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?

1434


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

2621