Answer Posted / farhat abbas naqvi
42 Kg per cft.
Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
Describe the advantages and disadvantages of using plastic and timber fenders?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40
How many cement sand ballast in cc 1:4:8 40mm
what's the formula for calculate pcc for matt(45mm aggregate)?
what does the grad of cement shows (denotes)?
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
material used for mendrel use to bend epoxy coated rebar
What is difference between engineering stress and true stress?
What is demising walls?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?