what is preposition of M-5 grade
Answer Posted / ranjithkumar.t
M-5 = 1:5:10
1 = cement use ratio for 1 cubic meter
5 = sand use ratio for 1 cubic meter
10 = Aggregate use ratio for 1 cubic meter
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
What is factor not to be taken in consideration in mix design?
What ingredients with% found in ppc cement??
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
What are the uses of groynes?
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
What is braced excavation all about?
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
What is meant by autocad?
What is Base Shear ?
Which Types Of Bricks ?
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
Detection of a beam & a girder are––––
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com