Answer Posted / anket
Thumb rule is 1sqmm can carry 3A
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
we have require a Motor (1500kW, 6.6kV, 50Hz) which shall operate at 1500rpm during 30min and after it shall run on 500rpm during 15min. The same cycle shall be repetitive during the whole working days. Which method is best and economic to achieve such type of task. VFD, VVFD, Pole changing motor etc.
Hello seniors m an engineering student in 3rd yr..i want to know what are the software course in electrical field?i wanted to do certification course but i dont know much about the course?..Regards
How to calculate multiplication factor in kva example 500kva ans pls ?
When we have earthing mesh or underground earthing network in industrial plants, weather we have NT-S or NT-C-S kind of earthing system, so eventually weather we must use 4 or 5 wire in 400 volt level (For example 3×150+70 mm2 or 5×150 mm2) in this connection I would like to know exactly the paragraph of IEC or IEEE number
details of oil cell size of Breakdown voltage test of tranformer oil details as per Standardswith mushroom electrodes?
How will polarity test of Dy5 Transformer ?
What is difference between Over Current & Earth Fault protection?
placing earthing pit in pathway is correct or wrong??. placing earthing wireGI1/18 inside walls is correct or wrong?. explain!!!
1.Z transform always lies around ? a) origin b) pole c) zero d) z=1. Multiples Mcqs which is bother me can’t find answers on internet. Some help required with little explanation . Note: this is not homework or related to any test. Thanks
what is static frequency converter?what is the function...of sfc...?
In a tap changing transformer where is the tap connected, is it connected in the primary side or secondary side?
why we use four type of phase angle difference between pimary & secondry winding of a transformer & where we use them?
what purose of the double circuit transmission line phase of the line phase changed for circuit-1 for Circuit-2 R-Y-B B-Y-R
What are the roles and responsibilities of electrical engineer in cement plant
what is th basic difference between a d latch time line and a d flip flop time line???