Answer Posted / david
Catalytic cracking is a thermal distilation conversion of long chain hydrocarbon into short chain hydrocarbon.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
the avg piston speed of an internal combution engine increases as cylinder dimension decreases justify?
Question for mech.engineer in dmrc
hi dear friends i have applied RRB exams SE so i need previous year question papers please send to my mail id santhu.hpt@gmail.com
Why the ship cranes are not having counter weights irrespect of industrial & civil construction cranes are having counter weights.
DIFFERENCE BETWEEN CODES,STANDARDS & SPECIFIFCATIONS?
There is a back compression in Engine, what does it mean
What is the difference between P11 & P22 pipes?
Whether entropy is intensive property or extensive property ?
Define stefan boltzman contant.
send me vizagsteel papers (m.t.. please.)
We have fifteen year old CNC turning lathe,placed in dust proof room,recently giving control problems frequently.We are considering to retrofit it.Pl.brief me about various point I should consider for accessing the mechanical health of machine.
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
Explain the procedure in staring a F.O. purifier
how to change numbering in SAP script i.e. i have 1245.00 now i want to specify in word in script i.e. one thoushand and fourty five rupees.
please send the last 5 years {{{JUNIOR ENGINEER GRADE II - MECHANICAL RRB CHENNAI}}} TECHNICAL question papers