how many nos of hacking over concrete surface required for
1 sq m area
Answer Posted / alagappan
72 to 80 nos per Sq.ft
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
how much quantity of cement,sand and water required for 1 sq feet flooring work .
Explain what is zoning permit?
What Are The Steps Involved In The Concreting Process, Explain?
in the earthquqke the profile of water on dam is parabolic or not
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
how i can tak Quantity of mortar in block work
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
What is absolute pressure? How absolute pressure is calculated?
What is meaning of FREE STANDING STAIRCASE ?
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
pls tell me about method of cutting length of ties column
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??