Answer Posted / rk jain
M-10
Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
why we use 19x9x9and 20x10x10 but not other
.5Ast
What are some structures that may be subjected to fatigue?
what is the mix design for M:60 with micro silica andmetakaoline?
What is the use of extend command?
Process of pcc in wateredug
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
All aptitude question of Bechtel
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
How to calculate laplength for 3 floors
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
what is right & short method of measurement of slab&beam