While Calculating Quantity Of cement,sand,Metal we get cement in no of bags,Where Sand & Metal we get in Meter Cube(M3)how to convert it to Units(i.e in no of lorry's or Tractors )
Answer Posted / santosh
0.0347
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
What is the primary difference between adsorption and absorption?
Special thing in designing a overhead reservoir ? which is different from an ordinary design
How did street originate in the plumbing term street ell?
What does a construction cost covers and what does not?
how can we calculate steel value, depending on load
Doul Bar reinforcement and details of drawing.
How to calculate unit weight of concrete for m40 grade.
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
can any one explain bar bending schedule of bems and columns and slabs ??
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
Advantage of Aluminum form work in terms of activities can be skip and cost too
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
How much cement and sand required for 9"brick wall per square metre