what is diff between auto level and dumpy level?
Answer Posted / kabilan m
in dumpy level we have to adjust the bubble level as said above.
and
in auto level there comes a internal compensator mechanism (a swinging prism) which takes care of adjusting the line of sight, so no need of leveling the bubble. it is most preferred in road construction...
| Is This Answer Correct ? | 40 Yes | 9 No |
Post New Answer View All Answers
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
What is a kip?
how to compute slab reinforcements on step by step procedures??
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
Explain what is 1/8 on the architect ruler denotes?
specifications of fe500 steel
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
how many material required for brickbat water proofing of toilets.
What is the average density of soil?
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
What is the name of this multiplication factors ?