Answer Posted / ruchita raj
1:1:1
Is This Answer Correct ? | 3 Yes | 11 No |
Post New Answer View All Answers
What is an ice dam sock?
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
How to find CN by using arcgis 9.3?
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
in the earthquqke the profile of water on dam is parabolic or not
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
Tell me about triple point of water.
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
how is the reinforcement is distributed in triangular slab
What are the applications of cad?
What is the difference between undo & redo?
Why was the empire state building made of steel?
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
Define What is a kip?