beam is fixed at both end which is 8 m span carry udl of 10
kn/m at left half span.there is internal hinge at
center.what is reaction at center
Answer Posted / sajal garg
7.5KN
Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
please send me bhel questions on rupesh.017@rediffmail.com
what's the formula for calculate pcc for matt(45mm aggregate)?
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
what is anchorage length,lap length and (dont remember the last one)
Formula for calculating the volume of bulb in underreamed pile
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
For what building Built-on balconies are preferable? What are the advantages?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
What is binding spacing of the rebars at lapping zones.
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
What are the responsibilities of a site manager?
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
What is the force exerted by the tacoma narrows bridge?
what is the dimensions of river sand truck trailer or trolly ?
what is the minimum cement content for M20 & M25 as per is code -456(2000).