What are the methods to do a estimate.
Answer Posted / suresh s sonone
1.detailed estimate
2.supplimentary estimate
3.revised estimate
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
What is meant by engineering drawing?
how much percent are used 20mm,10mm?
What are the disadvantages while using stone dust as filler in pavements?
What is pre-stressed concrete?
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
What quantity of 1.0 m3 bricks required?
types of survey and levelling instrument ?
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
Does VDF add strength to the flooring apart from preventing water ingress?
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
how to conversation of all construction material in to brass
How will you reduce the concrete flow after mixing the concrete
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft