how many bricks are required for masonary trench having
length of 31 mtr, depth of 0.6 mtr and breadth of 0.45 mtr
on single brick work as well as double ( 9" ) brick work
Answer Posted / suresh s sonone
4185 nos req
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
How and where are aqueducts built?
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
Permissible wastage of cement as per IS code ? In which IS code I get it?
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
rimmer in pile foundation
Slab quantity
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
How many feet are in 4 square yards?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
afe or not
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like