brick size-230x110x75, how many no of bricks cover 1cubic meter.
Post New Answer View All Answers
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
How do you convert wind speed into force?
WHAT DLC DESIGN IN CONSTRUCTION
Why does the pressure increase under soil?
What is the coeffiencent Friction Angle between Steel and Ashphalt?
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
What is rate of concrete surface rendering work per sqm
What is an ice dam sock?
what is tension column?
How to make a c++ program that converts any base to base 10?
what are the layers of the national and heir aprox thickness??
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?