Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the volume of sand in per cubic meter if we have a design mix of concrete is 1:2:4 (by volume).

Answer Posted / darshandachchu@gmail.com

2*1.54/7=0.44 m3

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why building got air crack? if it get in one particular are what is means?

2467


What is demising walls?

1175


Any strength is a stress but any stress is not strength

1822


In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.

3992


any book or article on pumped concrete.

2212


how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm

2124


What is the use of water table & Kreb stone for drain

1862


For Wet Mix Mecadam design what is Optimum moisture content

2055


what is diffrence between catchment area,watershed and basin?

2984


I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.

6091


what is c4x light weight cement blocks

5677


how to calculate the weight of concrete

1619


What is type failure of road surface? how to repair the failure of road surface?

2486


what is idealized curve for concrere and steel

2319


what do you know that m20,m25

1905