Why attemperation is required in HRSG in a combined cycle
power plant?

Answer Posted / keyur donga

when the main steam temprature is goes high At varying load of the HRSG At this this time We maintain the Steam temp by using attempration in HRSG.

Is This Answer Correct ?    13 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

By any way can we increase the B check hours from 300 to 500

1699


how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?

1236


What is difference between secondary Air & Tertiary Air and Their use.?

1480


How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.

1826


explain how the third harmonic content of the magnetising current affects transformer design

2773






We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?

1435


Why superheated are started before I'd and rd fan?

1695


im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much

1481


why do you consider yourself a suitable candidate for this position

6983


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

1771


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

2770


How We Calibrate the vaccum transmitter?

1471


LAPT working in alternator / generator

2551


what is the basic use of power plant in equipment

1231


procedure of how to generate power in solar plant.

1379