Answer Posted / guest
These mixes doesn't have any ready-made ratio's available like M20,M25. usually they are specified by mix design.
(eg: IS 10262-2009)
Is This Answer Correct ? | 24 Yes | 1 No |
Post New Answer View All Answers
What is the difference between built area and super built up area?
Explain the various stages of the project planning process in construction?
What is semirigid connections?
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
how much shouid be the rate for ready mix concrete per cubic meter
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
what are the changes in concrete pour height as per IS 456, 2009?
what is grade intersection?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
What is chemical composion test
how to calculate the size of triangular ring in rcc column?
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
how statics is different from dynamics