ratio 1:4:8: for pcc. area 1008 cft. thickness 6' what is the quantity we need
Answer Posted / shariff
4.28 Cum
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Write short note on construction programme for pile foundation.
Explain what is the release of lien?
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
What are the different types of runners?
how much percent are used 20mm,10mm?
what is difference between fluidity and workability also how palsticizer works
Please design 12.5m long dubbly beam
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
What was asked in isro civil interview
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
How can I make justification between using concrete grade c35 compare c37?