ratio 1:4:8: for pcc. area 1008 cft. thickness 6' what is the quantity we need

Answer Posted / shariff

4.28 Cum

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Write short note on construction programme for pile foundation.

4968


Explain what is the release of lien?

659


i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?

11534


How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft

1730


What are the different types of runners?

682






how much percent are used 20mm,10mm?

1439


what is difference between fluidity and workability also how palsticizer works

6707


Please design 12.5m long dubbly beam

1474


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

1672


Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards

1582


What was asked in isro civil interview

500


can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...

1667


We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?

1599


If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?

1712


How can I make justification between using concrete grade c35 compare c37?

1096