Answer Posted / harshitha
The velocity of with which the approaches or reaches the weir or notch before it flows over it.
Is This Answer Correct ? | 28 Yes | 10 No |
Post New Answer View All Answers
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
The concrete slump recommended for beams and slabs; is?
how we calculate the grade of the Bituminous materials.?????
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
How do you measure water flowing through 300mm diameter pipes?
Define What is diversion tunnel in a dam?
How cracks in concrete can be avoided?
What is the use of extend command?
how to calibrate the RM 800
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
what is called the inverd level of mabhole chamber?
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.