I had finished D.E.E.E at 2004,I wish to take C license.I am working pvt company HT supply but my professional certificate was missing.I have diploma & course completed certificate.without professinel may I got c license?.pls guide me.
Answer Posted / santhosh
have u got 2 yrs experience in HT installation or maintenance field your qualified for getting c license and no need to submitt professional certificate only submit diplama certificate.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
I want d.g.set our company
what is 30-phase of transformer
Dear Mr B C pal...Can you plz. put some light on principle of operation of Z-Ct in conjunction to its use with 1Cx1000Sqmm HT Cables & Directional Ground Fault / Over Voltage Relays...Regd..Parag v K 9899115632
Give atleast 20 alternating current apparatus and devices.
Why in 6 KV XLPE cable termination kit used and why not in 380 V xlpe cable same is not used
If we have use two power cable for incomer, that time how many use cbct for earth leakage protection? 1 or 2 if 1 way? If 2 way?
If not into production, how far did you follow the design and why did not you see it into production?
HELLO EVERYONE, I RECENTLY HAVE FOUND ONE PROBLEM, I WAS TAKING NO LOAD TRIAL OF AN HT MOTOR 920 MOTOR , 1440 RPM , 6.6 KV, WITH AUTO TRANSFORMER. AT 450 V, LOAD WAS 40 AMP AND SPEED WAS 250 RPM. BUT AS WE INCREASE VOLTAGE FROM 450 TO 480V, LOAD BECOME 41 AND SPEED REDUCED TO SOME RPM . SO WHICH PHENOMENON ACTED HERE FOR REDUCING SPEED.?? AND IS IT HAPPENING ALWAYS OR IT IS RARE? I ALSO HAVE FACED SUCH PROBLEM WITH FEW LT MOTOR ALSO.
WHY MOSTLY Rph IS USED FOR CONTROL CIRCUITS AUX. SUPPLY ?
what is p.s impedance measurement test in earthing transformer?
What id difference between power and energy?
How RTCC panel is working and give single line diagram for RTCC with transformer?
Sir,In our company there are 3 caterpillar make(capacity:(1) 3.3KV,2.5MW(2)3.3KV,2.5MW & (3)3.3KV,1.9MW) & 1 deutz make (capacity:11KV,3.8MW)gas engines utilised,all are running in paralell. There are three transformer utilised,(1) 6.25MVA,3.3KV/22KV,Impedence voltage:6.7% used for two generator,both are 2.5MW(2)5.5MVA,3.3KV/22KV,Impedence voltage:7.2% used for one generator of 2.5MW & (3) 5.5MVA,11KV/22KV,Impedence voltage:7.8% used for one generator of 2.5MW.all generator breakers capacity of 1250Amps. Sir,I want the details of fault level calculation of generator,transformer individually & for whole system. If you require any information from me.feel free for contact me sir.pl.send the answer of my question as the earliest as possible.
What is the unit of attenuation?
how we can calculate 2 phase welding transformer rating or total power?