How much percentage of silt contain maximum allowed?

Answer Posted / mangesh gavhankar

Maximum 10 percent silt contains is allowed

Is This Answer Correct ?    1 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?

5604


Which architectural movement is also known as jazz moderna?

830


What is thumb rule in quantity and cost estimation of a residential building?

2645


I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks. 

2324


20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u

1893






What is meant by scaffolding coefficient?

2187


how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress

1378


what is the difference between natural draught cooling tower and induced draught cooling tower

1826


Why is concrete cube test carried out?

768


What are the advantages and disadvantages of lead products in construction?

738


Tell me about triple point of water.

671


What are the reasons for geotechnical site investigations in uganda?

645


how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?

1532


What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?

2245


I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2

1808