Answer Posted / bheem rajashekar
defination w.r.t ps:-
It is the power needed by the transmission line to transfer
active power from one point to another point.This means
without reactive power,active power can"t be transferred.
Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
l&t switch FN 63 handle position can we change
The metal-enclosed switchgear and controlgear is subdivided into three types: 1. metal-clad switchgear and controlgear; 2. compartmented switchgear and controlgear 3. cubicle switchgear and controlgear. What is the main differnence between them. State some example.
I am interested to know what does 15 KVA DG set actually means? If I dont know the DG rating, is it possible to identify KW by simply knowing the diesel consumption?
What is the necessary condition for stability.
how to select correct size of power cable for inverter duty motor
how much excitation voltage required to generate 1mw power?
What happen if we apply square wave or traiangular waveform voltage to the transformer primary winding instead of sinusoidal wave?
Define pole pitch?
If we use 250A MCCB as a incomer in Control panel for a fault level of 50kA for one second ,assuming temperature rise from 85 Deg. to 100 Deg , Then what will be the Aluminium Bus-bar size for 250A MCCB? Explain in detail.
What are the advantage of free wheeling diode in a full wave rectifier?
How generating electric power export to grid from the generating station ?
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,
how is the cable tray designed & how its total length is calculated for an Industrial plant Say for Ex. (500KW Motor Load)
what should be the acceptrd value of winding resistance for 2.5MVA transformer
what is the soft starter principle? how is connection diagram? what is the procedure for checking the connection?