how much quantity of bending wire required for 1sqmts
Answer Posted / deepak katyal
7-8 grams per sq.Mt.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
In Rcc ratio calculation I wanted to know quantity of Steel also.
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
What are the types of slump?
insted of bentonite we can use any alternate material in piling ?
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
What is command line?
Describe a time when you anticipated potential problems and developed Preventive measures