I want to build 100 megawatt hydel dam. What does mean, 100
MW per hour? then how many electric bulb of 100 Watts the
dam would lit?

Answer Posted / saurabh bhardwaj

No, it means we are giving 100MW input power to the alternator. We can lit 1000000 bulbs.

Is This Answer Correct ?    15 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

can dp type level transmitter work in under vaccum condition

1543


LAPT working in alternator / generator

2554


what is the basic use of power plant in equipment

1231


By any way can we increase the B check hours from 300 to 500

1699


procedure of how to generate power in solar plant.

1379






How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.

1826


why airtel use + 24 volts and other operators use -48 volt

2108


What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?

1938


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

518


How We Calibrate the vaccum transmitter?

1471


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

1884


what is the meaning of SST300 V56A in SIEMENS turbine

3888


our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....

1198


What is LB-SR.

2489


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

2770