What should be percentage of silt content in sand?

Answer Posted / ts satheeshkumar

should be less than 8%

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1283


How to calculate paint drums per meter square

2022


how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you

2121


How much time Required for PPR pipe network testing

1694


how many kg of 20mm, 10mm, dust available in one ton stone boulder

1428






i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?

11539


how to take concrete quantity for precast segment for viaduct project?

2580


which method is used in semi-rigid connection design??

1803


Explain the difference between shear and tensile strength.

663


a butt weld is specified by

2591


may i know the detailed description of cutting length

1637


i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............

2645


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1495


What is Time period of a building and its relation with frequency ?

747


Define absolute co-ordinates?

753