Answer Posted / ashis paramanik
Bills may be of three types:
a)Intermediate or running payment
b)Running and Final payment
c)First and Final payment
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
brickwork labour rate per cum ?
how i convert mm into standard wire guage (SWG)no.
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
How many cum of 9.5mm stone in 1 ton ?
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
pile load testing procedure
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...