Answer Posted / ashis paramanik
Bills may be of three types:
a)Intermediate or running payment
b)Running and Final payment
c)First and Final payment
Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
undistributed samples are obtained by
What out turn civil works
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
Define What is the origin of name Railway Sleepers?
What is the average density of soil?
sir how can we find the cement and sand required for making 4" drop
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
What is the density of most of construction materials?
How to determine spacing of bars in slabs or beams
on what basis the partial factor of safety are decided? form the load combinations
How to calculate the crank rod in slab
Define mirror?
how much one carpenter can doing shuttering of slab in one day
What do you mean by the word 'shear'?