how to calculate shuttering design & position & quantity of
props & type of method for succsessful work

Answer Posted / guest

First calculate the area of form works and divided by
300mm.That is the quantity of props

Is This Answer Correct ?    2 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix

4523


how many digree of freedom in four bar chain

1920


What are the responsibilities of a construction manager?

792


how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.

1569


How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?

1371






What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??

1948


How can we demolish concrete beams?

1774


Basic questions of civil engineering

1620


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

1777


Pls provide me with the calculation or codes related to de- shuttering of flat slabs

5920


How cracks in concrete can be avoided?

644


60-70 grade of Bitumen is VG-30 ?

1675


how to calculate quantity of bricks in circular manhole with examples.

4994


Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?

5613


cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate

1210