You have casted a column above your footing, and you found out
it is off its location by 5cm. What would you Do?

Answer Posted / mkg

We have to go for chemical rebar of total no of steel bars at its proper location.

Is This Answer Correct ?    2 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why top layer of block work shoud be full size if any cut block adjustable than another layer?

1675


Please design 12.5m long dubbly beam

1481


how we calculate the vol.of wet concrete..?

1415


how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?

1536


can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com

2061






how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you

1511


how much quantity of cement,sand and water required for 1 sq feet flooring work .

1999


What is the difference between chamfer and fillet?

796


What is Base Shear ?

673


can you give me the details of rate analysis of steel and concrete?

2471


Why joints are provided?

687


what is differences between ferrock and concrete ?

1430


For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?

1782


the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum

1631


if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column

1616