Answer Posted / sunil
less tan 1% silt in sand
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
What is the difference between Fe 500, Fe 500 D and Fe 515.
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
What is zoning permit?
What is the difference between chamfer and fillet?
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
How many square meter can a worker/labor demolish a structure per day?
what is raft foundation