What is the difference between single reinforcement
Answer Posted / pappu kumar
reinforcement is done on both the tension as well as on
compression zone.when the moment of resistance is needed to
increase, double reinforcement is done .
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
what is smart building materials?
Coverage of 25mm.thick ratio of 1:4 cement mortar?
What is the use of extend command?
How can we convert weight batch to volume batch for m30 mix
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
How many square meter can mason layout chb per hour
How to calculate volume of concrete & steel on tank foundation & ring wall ?
Define What is an ice dam sock?
What you understand by richter scale?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
For what building Built-on balconies are preferable? What are the advantages?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?